we hired, we fired, we wired
Week 1 recap:
We made a lot of progress, but we didn’t really do that much. Jeff has the amazing ability to keep it all framed in a positive perspective and he’s right, things are going great. Over the course of the week, we realized our general contractor was pretty unprepared, so we’ve had to take over the process. We hired 2 riggers quick-fast-in-a-hurry to guide us. We got rid of most of the General Contractors crew, and we wired up a few of the frames. Our fingers are crossed to begin installing frames on Monday.